BIMReview

Unlock the full potential of your BIM projects with a tool built for collaboration, clarity, and control. Explore how BIMReview empowers teams to streamline workflows and deliver better results, faster.

BIMReview_Cropped

BIMReview is a collaborative BIM project review tool designed to support every stage of the construction process. It enables project teams to efficiently import, review, and interact with BIM models and data from various CAD platforms, all within one affordable, feature-rich environment.

Favoured by thousands of industry professionals, BIMReview is known for its intuitive interface, powerful clash detection, and support for IFC import/export. The platform enhances collaboration by consolidating model data from multiple sources, allowing for clear, visual communication and more informed decision-making across teams.

Benefits of BIMReview for your business

  • Smarter Collaboration, Faster Decisions

  • Streamlined Planning, Reduced Risk

  • Rapid ROI, Minimal Learning Curve

  • One Viewer for Every File

Smarter Collaboration, Faster Decisions

Bring models and data together from Revit®, Tekla®, IFC and more for seamless communication across the entire project team.

Streamlined Planning, Reduced Risk

Quickly detect and resolve clashes early, saving time, avoiding costly mistakes, and keeping schedules on track.

Rapid ROI, Minimal Learning Curve

Affordable and intuitive, BIMREVIEW requires no training—just download, install, and start reviewing in minutes.

One Viewer for Every File

Effortlessly open and interact with multiple BIM formats including BSWX, IFC, XML, GTCX, and more. All in one place.

Features of BIMReview

BIM Compliant
bimreview-model

• BIM Best Practise Procedures
• Full Visibility

Import Multiple Formats
import-data

• Import Multiple Design Models inc. Design Data, Tekla, Advance Steel, ArchiCad and Revit Models APIs
• Import of IFC and CIS-2 formatted models
• Import of Step and IGES based models
• Data Grids for all or selected Attribute Data
• Extended User Attribute (EUA) creation
• Assembly/ Parent entity selection
• Batch grid update of Attribute data
• Remove selected imported model

Model Enquiry & Manipulation
model-enquiry1

• Hide/Show Entities
• Clip Plane Adjustment
• Move/Rotate/Scale Model
• Enquiry and Measurement Tool
• Display Object/Part Centre of Gravity and Weights*
• Imperial / Metric Dimensions
• View Points
• Find objects by Attribute
• Colour objects by Attribute
• 3D CAM Data viewing

3D Clash & Conflict Detection
clash-detect

• Immediate Identification of Clashes
• Highlights Conflict Issues
• Enables multi-discipline teams to find solutions before issues reach the site.
• Minimises costly on site problems

Collaboration
information-share

• Real-time access to BIM model content through the supply chain, and across dispersed teams
• Enhanced decision support through improved collaboration
• Annotation and Translate, via Google Translate
• User-defined properties
• View capture and email
• Attach drawings and documents to objects
• DWG and DXF viewers

Intuitive 3D Mark-Up
markup

• Intuitive mark-up facility
• User defined, fully customisable shapes
• Create notations to any item and location within a model

Visualization & Understanding
material

• Rendered views; Perspective, Orthogonal, Fly Through
• Material pre-set for refining visual model
• Material Textures
• Reflections on Ground Plane
• Auto generation of Terrain Ground Plane
• Multiple Lighting Effects
• View Shadows
• Adjustable Transparency
• Display Rendered View in Full Screen
• Gradient Coloured backgrounds
• Skyboxes (360° Backgrounds)

Construction Planning
gantt-planning

• Fully integrated project hub, bringing together data
• Create and replay project or construction sequences to rapidly understand and resolve issues
• 4D Gantt Chart timelines for engineering, procurement, suppliers and construction teams.
• Erection sequences by attribute type
• Export model to Google Earth

Enriched Export Options
output

Export entire models via IFC format
Export custom selection via IFC format
Exported drawings can be used in conjunction with any IFC supported software
Print views and drawings (with Preview)
Animation creation and video capture
Export to Excel from the data grid

Features at a Glance
features

FEATURES

Model and Data

  • Import multiple models into a single environment
  • Open IFC formatted models
  • Export of IFC models
  • Open CIS/2 formatted models
  • Open Step and IGES based models
  • Data Grids for all or selected Attribute Data
  • Clash Check and Rule Manager
  • Extended User Attribute (EUA) creation
  • Assembly/ Parent entity selection
  • Batch grid update of Attribute data
  • Remove selected imported model
  • 3D Navigation
  • Import of GTCX files
  • Direct link with Tekla
  • Direct link with Revit
  • Direct link with Inventor
  • Direct link with Solidworks

Model Enquiry and Manipulation

  • Hide/Show Entities
  • Clip Plane Adjustment
  • Move/Rotate/Scale Model
  • Enquiry Tool
  • Measurement Tool
  • Accumulative measure
  • Multiple line measure
  • Angle measure
  • Multipoint measure
  • Saveable dimensions
  • Auto dimension
  • Measure to centre of gravity
  • Display Object/Part Centre of Gravity
  • Weights
  • Imperial / Metric Dimensions
  • Save model views
  • Find objects by Attribute
  • Colour objects by Attribute
  • Colour by Attribute Templates
  • Label by Attribute

Information Share

  • Annotation and Translate, via Google Translate
  • Note creation
  • User-defined properties
  • Email captures views
  • Attach drawings and documents to objects
  • Remote BIM Data Sharing:
    • Models
    • Clash information
    • File Attachments
    • Mark Ups
    • Annotations
    • Viewpoints
  • DWG and DXF viewers
  • 2D & 3D CAM viewers
  • Markup
  • BCF Support
  • View embedded review data

Visualisation and Understanding

  • Rendered views
  • Perspective, Orthogonal Views
  • Fly Through animations
  • Material pre-set for refining visual model
  • Material Textures
  • Reflections on Ground Plane
  • Auto generation of Terrain Ground Plane
  • Multiple Lighting Effects
  • View Shadows
  • Adjustable Transparency
  • View in Full Screen
  • Gradient Coloured backgrounds
  • Photorealistic backgrounds

Construction Planning

  • 5D Gantt Chart planning, with timeline model review
  • Export model to Google Earth
  • Sequence Construction by Attribute Type
  • Sequence Animation
  • Ability to import MS gantt chart projects

Output

  • Print Views and drawings (with Preview)
  • Generate animations
  • Record animations into AVI format
  • Record animations into WMV format
  • Export to Excel from the data grid

The STRUMIS team is here to help.

Contact us to arrange a consultation to see how you can start saving time and money.