
Billington Structures Ltd, a leading structural steelwork contractor in the UK, has embraced the 'Just In Time' (JIT) strategy with the help of STRUMIS, unlocking significant improvements in materials logistics, procurement, and production flow.
“We were an early adopter of STRUMIS and are extremely pleased with our investment.”
Spokesperson, Billington Structures Ltd.
Tackling rising material costs with smart inventory strategy
In today’s fast-paced construction environment, rising raw material costs and long lead times can place a heavy burden on cash flow especially when excess inventory sits unused. JIT strategies allow fabricators to minimize stock holding costs, while ensuring materials arrive exactly when needed for production. But to work effectively, JIT requires precision, planning, and the right technology.
That’s where STRUMIS comes in.
How JIT works in steel fabrication
For steel fabricators like Billington Structures, JIT involves:
-
Pre-reserving materials based on project forecasts
-
Calling off materials once final production schedules are confirmed
-
Purchasing at original reservation prices, even when steel costs have risen
This allows materials to arrive just in time for fabrication, avoiding storage delays, reducing waste, and protecting against price fluctuations.
STRUMIS: The engine behind JIT efficiency
STRUMIS makes it easy for Billington Structures and other fabricators to implement JIT strategies across departments seamlessly linking procurement, inventory, and production data. Key features include:
-
Real-time inventory tracking across multiple locations
-
Automated material reservation and purchase orders
-
Supplier integration with detailed transaction reporting
-
Materials optimization with nesting and cutting plans
-
Traceability and process control throughout the production cycle
“By linking our Inventory with Procurement and Production, STRUMIS enables agile procurement based on optimized project planning and shop floor routing, such that materials are ordered and delivered just in time. This results in better time management and cost savings for our business,”
Billington Structures spokesperson
Smart purchasing with supplier integration
With STRUMIS’ supplier module and Electronic Data Interchange (EDI) functionality, Billington Structures automates critical purchasing workflows:
This deep integration results in faster decision-making, reduced human error, and enhanced cost tracking.
Projects:
🏟️ Derby Multipurpose Sports Arena

🏢 Bevis Marks Domed Roof Tower, London

⚽ St George’s Park – National Football Centre, Burton upon Trent.

From sports arenas to high-rise towers, the benefits of STRUMIS are reflected in their consistent, on-time, and cost-effective delivery.
Ready to Optimize Your Materials Management?
Whether you're aiming to reduce material waste, streamline purchasing, or strengthen your supply chain, STRUMIS is the proven solution trusted by leaders like Billington Structures.
Talk to our team today to learn how STRUMIS can help your business implement an effective JIT strategy and take control of your production cycle.